Visual Circuits ReelTime 4 Manual de servicio Pagina 82

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 111
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 81
6: Mechanical and Electronic Adjustments
CHRISTIECHRISTIE 35/70 Service/PM Manual
March, 1997
Line Voltage Selection
To locate jumpers and terminals, refer to the 35/70 Power Supply component layout in Section 8.4.
240-VAC Operation
To configure the 35/70 projector for 240-VAC operation:
1. Remove the jumper from terminals 1&3 and 2&4 on T1 and the jumper T1 terminals 2&3.
120-VAC Operation
To configure the 35/70 projector for 120-VAC operation:
1. Remove the jumper from terminals 2&3 on T1 and jumper terminals 1&3 and 2&4 on T1.
Vista de pagina 81
1 2 ... 77 78 79 80 81 82 83 84 85 86 87 ... 110 111

Comentarios a estos manuales

Sin comentarios